finalize configuration replication
This commit is contained in:
parent
e1517bbf28
commit
fa66d1ba9c
30 changed files with 8867 additions and 1560 deletions
|
|
@ -190,3 +190,17 @@ Design phase is **already approved**. Proceed directly to implementation:
|
|||
5. Run `make test` in controller testsuite (task 5 validation)
|
||||
|
||||
**No further research needed.** All unknowns from the original research log are resolved in `design.md`.
|
||||
|
||||
---
|
||||
|
||||
# Cross-Spec Gap Audit (2026-06-08)
|
||||
|
||||
> Batch `/kiro-validate-gap` across 9 specs on persistent_ha branch.
|
||||
|
||||
## Analysis Summary
|
||||
|
||||
- **worker-join-refactor** is **~100% complete**. All 5 task groups, all subtasks (1.1–5) are `[x]` in tasks.md.
|
||||
- **Prior gaps RESOLVED**: `init_worker` (worker.c:339), `rejoin_worker` (worker.c:366), and `apply_join_state` (static helper) are all implemented. `add_worker` declaration removed from `worker.h`. The double-lock deadlock (`handle_worker_join` held `workermgr` WRITE lock while `makeWorker` re-acquired it) is eliminated.
|
||||
- **No remaining gaps**: `handle_worker_join` now has explicit `key_find` → branch → `init_worker`/`rejoin_worker` → `apply_join_state` flow visible at the call site. `BEFORE_EVENT`/`AFTER_EVENT` hooks fire at the same event points. `on_worker_join` called after successful join. Admin status bits (`LOCKEDU | CLOSED | HIDDEN | CLOSED_BY_ADMIN`) preserved in `rejoin_worker`.
|
||||
- **Build verification**: Run `/xce-build controller` to confirm `test_worker_join.c` (7 test cases) pass.
|
||||
- **Recommendation**: The spec can be marked `implemented`.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue