Extends task 2.1's test_scheduler_dispatch_commit.c with two tests
proving resource-in-use accounting survives more than a single round
boundary between dispatch and worker confirmation, per task 5.1's
"several rounds" / "matching a same-round confirmation" language:
- test_dispatch_commit_survives_several_rounds_before_confirmation:
loops 5 round-boundary cycles, asserting resInUse after EVERY round,
not just once.
- test_dispatch_commit_multi_round_gap_matches_same_round_confirmation:
compares resInUse after 1 round vs after 5 rounds and asserts
equality -- a same-round confirmation is modeled as nrounds==1 since
design.md documents re-applying JOB_STAT_RUN to an already-RUN job as
a confirmed no-op, so resInUse depends only on job->state, never on
confirmation timing.
Test-only; scheduler.c is untouched. RED phase independently verified
by both implementer and reviewer via an actual revert-rebuild-rerun
cycle (4/5 tests fail without the task 2.1 fix). Independently reviewed
and approved.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Cxa1PmqAB5PyXfJaNvj8TN
sched_commit_decision()'s DISPATCH branch now sets job->state = JOB_STAT_RUN
in the same operation that already commits job->allocs/job->accounts, per
Requirement 1.1/1.2/1.3. sched_account_jobs()'s existing JOB_IS_RUN gate is
unmodified -- this closes bug-1624 by giving it the input it was missing: a
dispatched job now survives a round boundary in resource-in-use totals
regardless of how many rounds pass before worker confirmation arrives.
Regression test drives the real, unmodified sched_account_jobs() across a
simulated round boundary (resInUse reset, no confirmation event) and
independently reverting the one-line change reproduces bug-1624 exactly.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>