Two coupled fixes for a live commit-stall (committed_lsn pinned at the own-term
NOOP while a 3-node cluster was durable to LSN 5 — jobs acked but never committed):
bug-991: the WAL catch-up applied_lsn was advanced to lsn+1 (next-to-apply) in
the three live/catch-up apply paths, but recovery/checkpoint/init and the leader's
catch-up streamer treat it as last-held. The over-advertise made the streamer skip
an LSN -> library logOk wedge -> no WalAck. Fixed to last-held (= lsn).
Option A (design reconsideration of REVIEW ISSUE 3): removed the
committed = min(durable-majority, raft_commit_index) ceiling. Under single-writer
the durable-majority watermark is already (term,lsn)-current-term-safe (term-carrying
replication + (term,lsn) reconcile/truncate-before-durable + own-term NOOP gate +
post-election truncate-to-safe), so the library commit_index was a redundant,
starvation-prone gate that pinned committed below the safe durable majority whenever
the library lagged. The durable-majority barrier + own-term writable gate are now
authoritative; raft_commit_index is inert-advisory.
Safety: reviewer-verified the durable-majority watermark is (term,lsn)-safe and
Figure-8 holds via the own-term gate (new RED->GREEN test); bug-851 cannot recur.
Live: commit trace 4->5 + walcompare committed-prefix identical across 3 nodes.
177 unit tests pass.
commit_submit(WAIT): n_vcpus-relative admission cap with fast retriable
NOT_READY (admission-cap-only per corrected contract), CLOCK_REALTIME
timedwait loop on the per-LSN + gate predicate, post-timeout predicate
re-check, n_peers<=1 self-quorum through the single advancement site.
Inflight counter accurate under engine lock for the full blocking
interval with XCE_TESTING asserts. 16/16 group tests green unmodified;
full suite at the 3-failure baseline.