Commit graph

3 commits

Author SHA1 Message Date
1abab94957
docs(specs): reconcile stale metadata found auditing stalled specs
- scheduler-sim-eager-reconciliation: all 9 tasks were done (last:
  task 3.3 full regression, commit 446437bf, 2026-08-27) but the 3
  section-header checkboxes were never flipped and phase stayed at
  tasks-generated. Same drift class as 5c82ad0b/b14e53f5. Checked the
  3 headers, bumped phase to implementation-complete.
- scheduler-allocation, scheduler-preemption: blocked_on named
  scheduler-core and scheduler-dispatch-commit, both of which reached
  implementation-complete weeks ago (2026-08-19, 2026-08-24). Annotated
  as resolved rather than removed, so the historical block reason
  stays visible. Requirements approval is still outstanding on both --
  not touched, since that gate needs human review.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01XYdtrEWWZfKRRGED7raEYg
2026-09-03 09:38:36 +00:00
0c736c795b
chore(specs): add scheduler-sim-eager-reconciliation spec, weekly report, cross-spec sequencing notes
New scheduler-sim-eager-reconciliation requirements spec; weekly_report skill;
weekly status report for Aug 16-22. Also records cross-spec dependency notes
on scheduler-allocation and scheduler-preemption reflecting how
scheduler-dispatch-commit's redefined RUN-state timing affects their designs.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01AgYRU3zDTqNGV5Jk8aiKLg
2026-08-24 12:56:35 +00:00
5e8a20178b add scheduler related projects 2026-07-31 17:42:13 +08:00