libxce-failover, raft-sim-conformance, ha-commit-durability,
ha-wal-replication, ha-heartbeat-committed-propagation, ha-prevote,
ha-elect-ctx-lifecycle, and ha-entity-snapshots all had 100% of tasks
checked but had never run a formal /kiro-validate-impl closure pass
(spec.json stuck at phase "tasks-generated", some with stale
ready_for_implementation flags). Each now has a fresh validate_impl
GO decision backed by an ASAN build, full standalone test-suite run,
and a live 10-round sequential HA soak with zero committed-job loss.
ha-commit-durability: closes the "pending confirmation under simultaneous
total outage" caveat. Reproduced cold-restart-all (kill all 3 members +
restart) 5 times against a live 3-node cluster on genuine ext4 (not the
sandbox's overlayfs) — zero committed-job loss across 40 rolling-failover
rounds + 5 cold-restart-all cycles. Confirms bug-795 was an overlayfs
fdatasync artifact, not a real durability gap; no production fix needed.
Commit Durability is now proven for both rolling single-node failover and
simultaneous total-cluster outage (src/controller/CLAUDE.md updated).
Live-validated and marked complete against a real 3-node cluster:
- controller-status 6.4: off-primary committed fidelity + responder
timestamp, confirmed via a real failover
- ha-heartbeat-committed-propagation 4.1: standby committedLsn tracks the
primary via heartbeat within the 3s interval
- ha-wal-replication 5.4: standby WAL replication verified via committedLsn
match (job-facing ops are correctly primary-only by design; standbys
return E_XCE_STANDBY, not a bug)
- libxce-failover 6.2: live 3-node failover E2E, jobsub raced against a
primary kill resolves to exactly one job, no duplication
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01SDWVNQLKxqTVHh42cH7rV3
10-round soak waldump+log bisect: the chaotic committed_job_loss is NOT the
catch-up/entity-snapshot prefix gap. All 3 WALs gapless/CRC-intact/full
payloads; lost job only on ctrl-1@LSN30 term9 vs term-10 NOOP on the majority.
The durable-majority gate worked (commit_submit -> -ETIMEDOUT), but
xce_run_hooks (hook.c:134-157) returns only the LAST-registered hook's rc, so a
later JOB AFTER_EVENT hook (sched/apiserver) returning 0 clobbered persist's
-ETIMEDOUT -> handle_jobsubmit replied jobsubmit ok for an uncommitted entry ->
term-10 leader legally overwrote it. Fix per raft-apply-decoupling item #1:
move the WAL append + commit barrier out of the hook into an explicit
handle_jobsubmit-driven raft step whose rc is read directly (down payment on
the full apply-after-commit inversion). Entity-snapshot gap is a separate,
still-real defect (not this soak's mechanism).
WAL-byte decode proves REAL data loss (not commit-index): committed prefix
entries physically absent from live nodes (ctrl-2 WAL starts LSN 16, ctrl-3 LSN
13), present only on the down node. Mechanism: empty-rejoin catch-up streams
[watermark..committed] not [1..], no snapshot to backfill the prefix -> permanent
gap. Predates libxce-failover. Full findings + open forks + xce_test waldump
tooling plan in INVESTIGATION-failover-job-loss.md. Not yet fixed.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Per design invariant (a controller exits only on crash or admin kill), replace the
self-abort recovery terminal (tasks 3.3/4.3/4.4) with a loud, permanent, non-promotable
fence that stays alive and keeps retrying catch-up (self-heals on peer return; no manual
admin recovery). Records the never-self-terminate invariant as project-wide guidance in
src/controller/CLAUDE.md + .kiro/steering/ha-async-io.md.