--- id: "bug-1942" status: "open" status_updated: "2026-10-10" status_note: "newly logged" component: "controller" severity: "wrong-result" timestamp: "2026-10-10T08:14:51Z" last_seen: "2026-10-10T08:14:51Z" occurrences: 1 files: ["src/controller/job.c"] tags: ["controller", "job-control", "parallel"] related: [] --- # bug-1942: xce_controller sends job control of a multi-host job only to its first host ## Description **Observed:** (source reading, `.kiro/reviews/project-gap-review-2026-10-10.md` (P0); to be confirmed by a failing test before the fix) Job control is routed to `allocs[0]->host` only (`src/controller/job.c:2126-2131`). **Expected:** Signals reach every host of the job (or the job's launcher is documented to fan them out and does so). **Impact:** Suspending or killing a multi-host job can leave its tasks on other hosts running. **Found by:** review: `.kiro/reviews/project-gap-review-2026-10-10.md` (P0) ## Environment - OS: no /etc/os-release; Docker container; NixOS kernel; kernel Linux 6.18.33 x86_64 - libc: glibc 2.42-47 (interpreter /nix/store/wb6rhpznjfczwlwx23zmdrrw74bayxw4-glibc-2.42-47/lib/ld-linux-x86-64.so.2) - Toolchain: gcc (GCC) 15.2.0, meson 1.9.1 - Build: asan (xce.build) - Code: scheduler-framework @ 94472ee3-dirty - Deployment: any (found by source reading; the failing test that confirms it is named in Verification) ## Reproduction 1. Run a 2-host job (e.g. `/xce-test-multihost`), stop it. 2. Tasks on the second host keep running. - Frequency: deterministic (by code reading; confirmed by the RED test of the fix) - Evidence: the code sites quoted in Description; no logs kept. ## Root cause TODO: required for fixed/partial ## Fix TODO: required for fixed/partial ## Verification - Test: TODO: name + file; RED before the fix, GREEN after - Suites: TODO: suite results and build profile - Live: TODO: soak/deploy run, or n/a and why ## References - Related: none