myxce/.kiro
Rongsong Shen 625663af59
test(scheduler-sim-decision-trace): end-to-end trace scenarios over the contention fixture
Task 6.1: drives the real simulator REPL with tracing on for all and
selected jobs at both levels, asserting every Requirement 2-6 section,
ordering in step and continue mode and at breakpoints, info trace at a
breakpoint, after finish, for arrays and after a units change, and a
byte-identical trace file copy.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-08 16:06:22 +00:00
..
settings finalize configuration replication 2026-06-09 16:40:13 +08:00
specs test(scheduler-sim-decision-trace): end-to-end trace scenarios over the contention fixture 2026-10-08 16:06:22 +00:00
steering docs(controller-peers-env-fallback): document XCE_CONTROLLER_PEERS in the build/deployment steering (task 6.1) 2026-10-03 08:23:32 +00:00