myxce/.kiro
Rongsong Shen 80e096b85e
docs(scheduler-sim-diagnostics): finalize requirements, design, and tasks for limit inspection
Requirement set 1 (info limit <name|all>) of the open-ended scheduler-sim-diagnostics
spec: requirements refined for effective vs. configured scope and exclusion-group
membership, design grounded in the actual limit-plugin/REPL source (accessor boundary,
GLOBAL/SHARED-vs-per-host read split, existence-vs-zero-usage distinction), and an
8-subtask implementation plan with full requirements traceability.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01RLSNJhNoULvVcUhXEFafQC
2026-09-17 08:22:11 +00:00
..
settings finalize configuration replication 2026-06-09 16:40:13 +08:00
specs docs(scheduler-sim-diagnostics): finalize requirements, design, and tasks for limit inspection 2026-09-17 08:22:11 +00:00
steering test(xce-harness-component): verify build isolation; narrow requirement 2.2 2026-09-14 09:59:15 +00:00