myxce/.kiro
Rongsong Shen b469b174a2 docs(job-array-single-wal-record): sync spec docs with phase-7 residual-gap closure
brief/requirements updated to reflect the reopened-and-now-closed
post-GO gap-closure phase (tasks 7.1-7.3); adds research.md capturing
the investigation trail; roadmap.md reflects current spec status.
2026-07-17 07:31:06 +00:00
..
settings finalize configuration replication 2026-06-09 16:40:13 +08:00
specs docs(job-array-single-wal-record): sync spec docs with phase-7 residual-gap closure 2026-07-17 07:31:06 +00:00
steering docs(job-array-single-wal-record): sync spec docs with phase-7 residual-gap closure 2026-07-17 07:31:06 +00:00