Relocate the 13 test files that lived inside controller_unit_test into
src/harness/testsuite/, add a new Unity runner (harness_test.c, modeled
on controller_test.c) carrying their extern/RUN_TEST entries, and
register the new harness_unit_test executable + suite in
src/harness/meson.build with an explicit build-order dependency on
xce_test (two of its tests spawn that binary over a pty).
Finish clearing the controller side: remove test_test_cli.c/
test_xcetest_process_entry.c from controller_unit_test_src and their
extern/RUN_TEST entries from controller_test.c, and remove the
temporary xce_test_controller_link symlink bridge task 1.1 added (no
longer needed now that both binaries build as siblings under harness/).
Verified: harness suite 132 Tests 0 Failures 0 Ignored; controller suite
1199 Tests 0 Failures 0 Ignored. 1199+132=1331 matches the pre-move
controller_unit_test baseline exactly (cross-checked against buglog
bug-1798/bug-1805).
Task 2.1 of xce-harness-component.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01RLSNJhNoULvVcUhXEFafQC