Commit graph

5 commits

Author SHA1 Message Date
7519fa96dd fix(ha-commit-engine,persist): reserve WAL lsn 0 — first entry starts at lsn 1
Root cause (found via live 3-node E2E + a verification test): lsn was 0-based
(hdr.lsn = current_lsn++ from current_lsn=0), and 0 was overloaded as a
sentinel, causing three cold-start defects on a freshly-promoted leader:
  - the first WAL entry (own-term promotion NOOP at lsn 0) was structurally
    uncommittable: commit_advance_locked only stores when cand>cur and
    committed_lsn starts at 0, so lsn 0 can never advance it;
  - commit_set_writable_lsn(noop_lsn=0) set writable_lsn=0, which wait_done
    reads as 'gate off' — the own-term safety gate was a no-op on the first leader;
  - bug-543 (WAL hole): ha_stream_wal_to_standby filters hdr.lsn>standby_lsn;
    a fresh empty standby reports standby_lsn=0 (ambiguous 'empty' vs 'has lsn 0'),
    so lsn 0 failed 0>0 and was dropped -> non-contiguous standby WAL.

Fix: a fresh persist store initializes current_lsn=1, reserving lsn 0 as the
none/empty sentinel. The first real entry is lsn 1 -> committable (0->1),
writable_lsn=1 -> gate effective, and standby_lsn=0 unambiguously means 'empty'
so catch-up streams from the first entry with no hole. persist_recover is
data-driven (current_lsn=max(hdr.lsn+1)), so existing on-disk WALs and non-fresh
recovery are unaffected; the change only sets the base for brand-new stores.
No wire/capnp change.

Verification: test_coldstart_lsn0 drives the real commit engine + real streamer
and proves H1 (first entry commits 0->1), H3 (gate effective + blocks when
committed<writable), H4 (empty-standby catch-up is contiguous [1,2], control
standby_lsn=1 gets only [2]). Full controller suite green under ASAN. Tests that
relied on the lsn-0 base were shifted (several strengthened); commit.c /
config_repl.c / ha.c / wire format untouched.

Owning specs: ha-commit-engine / ha-wal-replication / persist. Follow-up:
sweep stale lsn-0 comments (repl.c:429-436, persist.c:1055-1075/1240-1243/1296).
2026-06-14 10:46:16 +00:00
95a10cedf3 test(ha-commit-engine): full regression green + legacy-path audit (task 6.1)
Fixed the 3 bug-411 baseline failures honestly: stale timeout
expectation updated to the reject-on-timeout contract (engine-wired
fixture, killing power retained); two healthy-primary gate fixtures
populated with standby_endpoints (gate logic untouched). Census: 46
groups / 467 tests / 0 failures standalone under default ASAN.
Audit (reviewer-confirmed, recorded in tasks.md): no production walAck
path reaches the deprecated acked_lsn>0 counting or n_active==0
short-circuit except the documented LSN-0 first entry. Leak inventory
for 6 groups documented as follow-up.
2026-06-12 03:32:19 +00:00
f0d6074d4e feat(ha-commit-engine): engine instantiation + sync-append path switch (task 5.3)
cluster_t embeds commit_engine_t; init in cluster_init_phase2 after the
vtaskmgr guard (idempotence-guarded — phase2 can run twice), wiring
repl_set_commit_engine + ha.repl back-pointer before any standby can
register; fini after iomgr/vtask shutdown. persist_wal_sync_append
passes written_lsn; engine-wired path drops -ENODEV and the
committed_lsn store (engine owns advancement); LSN-0 first-entry
routes to legacy per the accepted interim. p2 -ENODEV pin updated to
the Req 6.3 contract. 34/34 + 6/6 green through honest delegation;
census exactly at the 3 validated baselines; production binary links.
2026-06-12 00:16:22 +00:00
e2fba08f5d test(ha-wal-replication): verify majority-ack advances committed_lsn (task 4.2)
Fix defective assertion in test_committed_lsn_advances_after_majority_ack
(before/after delta instead of >0 which fails for lsn=0 first write).
Add test_single_node_committed_lsn_unchanged documenting -ENODEV degraded
mode for no-standby path. Fix NACK test expected return from -ETIMEDOUT to
0: with 1 registered standby, quorum=1 is met by primary self-count alone.
308 tests pass, 0 fail under ASAN.
2026-06-10 11:18:25 +00:00
6bae7b382c test: P2-6 replication integration tests — trim, degraded mode, catch-up lifecycle (P2 gate)
Add test_p2_integration.c with 7 integration tests covering the assembled P2
replication system: WAL_CHECKPOINT assert invariant, trim_lsn with active standby,
checkpoint must not update last_replicated_crc, sync degraded mode, full catch-up
lifecycle, needs_snapshot boundary conditions, and API completeness gate.

All 32 controller unit tests pass (0 failures).
2026-05-07 18:41:10 +00:00