Lands the PeerCtrlDispatch machinery behind a DEFAULT-OFF flag
(g_drive_async_peerctrl_dispatch_enabled); production behavior is
UNCHANGED. peer_ctrl_msg_handler becomes a thin shim that takes
ownership of ep->fsm_in.pkt and either runs the routing body inline
(flag OFF, byte-for-byte the prior path) or dispatches it to the vtask
pool via vtask_enq_classified (flag ON). The 3 routers now take pkt as
an explicit param (no cross-thread ep->fsm_in.pkt re-read). Per-endpoint
arrival order is enforced by bind_vtask's endpoint_block_tasks.
Packet ownership: shim clears ep->fsm_in.pkt at dispatch (sole-owner
transfer); peer_ctrl_vtask_entry NULLs iod->pkt before the body frees
it once. New vtask_t.owns_io_pkt (default 0) lets taskq_item_killer free
the carried packet for an un-executed queued task at vtaskmgr_fini WITHOUT
double-freeing the libxce endpoint-owned path (bug-1199).
Adversarial review found two FLAG-ON hazards, documented with loud
comments (flag is OFF so production is unaffected), to be resolved before
task 3.4 flips the flag ON:
- bug-1197 (CRITICAL): raft_cb_become_follower endpoint_fini()s peer
vote-eps from a pool worker, racing the io_worker's read of ep->data;
needs iomgr_unmonitor before endpoint_fini in every pool-reachable
teardown.
- bug-1198 (HIGH): peer_ctrl_classify tags all work VTASK_LIVENESS, but
the CTRL_PRIMARY repl-ack path can run a blocking snapshot checkpoint
inline; resolved by task 3.2 (offload snapshot to SlowLane).
Per spec, 3.1 is not 'done' until the task 3.4 deadlock gate is green.
Tests: 3 new peerctrl tests; controller 196/196, lib 282/0; 0 net leaks.
vtaskmgr gains vtask_class_t (LIVENESS/LIVE_BLOCK/REQ_BLOCK) + a pool-level
blocking reservation: REQ_BLOCK fast-rejects -XCE_ERR_NOT_READY past
n_vcpus-R; LIVENESS never gated (deadlock-freedom). commit_submit folds its
inflight_waits onto the pool via commit_set_pool; production wired in
cluster.c phase2 (vtaskmgr_set_liveness_reserved(R) + commit_set_pool).
Lock order p->lock->ce->lock->blk_lock. Dormant until 3.1. Commit suites
38/30/22/38 green; lib 282/0, controller 196/0, ASAN clean. Phase 1 done.