myxce/.wolf/bugs/bug-1976.md
lei.chen 13a28a387a wolf: log bug-1976 fixed (controller dispatch commit dropped allocs_shared)
Co-Authored-By: Claude Code <noreply@anthropic.com>
2026-10-28 05:40:03 +00:00

90 lines
4 KiB
Markdown

---
id: "bug-1976"
status: "fixed"
status_updated: "2026-10-28"
status_note: ""
component: "controller"
severity: "wrong-result"
timestamp: "2026-10-28T05:37:09Z"
last_seen: "2026-10-28T05:26:00Z"
occurrences: 1
files: ["src/controller/job.c", "src/controller/testsuite/test_dispatch_commit.c"]
tags: ["external-license-resources", "limits", "shared-resources", "dispatch", "e2-phase3"]
related: ["bug-1860"]
fix_commits: ["76ddd75f"]
summary: "controller dispatch commit drops allocs_shared — vres usage never charged, limits unenforced"
---
# bug-1976: controller dispatch commit drops allocs_shared — vres usage never charged, limits unenforced
## Description
**Observed:**
E2 Phase 3 t1 E2E: 4 projA jobs with `-R "rusage[extlic=1]"` against a
per-project limit `extlic_share` (scope projA, cap 3.0) — ALL FOUR ran
instead of the 4th PENDing with reason limit_global. Live gdb on the
scheduler showed `sharedInUse[36/37/38]` (the vres instances) = 0.0 with
3 projA jobs RUN: the vres charge never landed.
**Expected:** the 4th projA job PENDs (limit_global); killing a RUN job
re-admits it; projB unaffected (own per-project instance).
**Impact:** every scheduler-side global limit (the limit vres mechanism)
was advisory only — no quota was ever enforced, for ANY shared resource
carried via allocs_shared, since dispatch-time adoption overwrote the
scheduler's own charged accounts with a shared-stripped copy.
**Found by:** spec task (external-license-resources E2 Phase 3 E2E).
## Environment
- OS: Ubuntu 24.04.2 LTS; kernel Linux 6.8.0-147-generic x86_64
- libc: glibc 2.39
- Toolchain: gcc (GCC) 15.2.0, meson 1.9.1
- Build: debug (build.dbg)
- Code: feature/license-resources @ 76ddd75f (bug present since dispatch
commit was introduced, f4b1ba4c-era)
- Deployment: t1 single-node controller + t2/t3 workers (de-nix binaries
in /opt/xce-denix), xceesd reporting extlic via fake_lic.sh
## Reproduction
1. Push a config with a per-project limit (limits.yaml `extlic_share`,
cap 3.0) and an EXTERNAL resource extlic with ≥4 free.
2. Submit 4 jobs `-P projA -R "rusage[extlic=1]"`; observe all 4 RUN.
3. gdb scheduler: sharedInUse[vres idx] = 0.0 despite 3+ RUN jobs.
- Frequency: deterministic.
- Evidence: this record + t1 E2E transcript in session (2026-10-28).
## Root cause
The controller's dispatch-time commit (`dispatch_a_job_()`, job.c)
rebuilt `j->job.allocs` from the scheduler's dispatch payload but
migrated ONLY the per-host records (`MOVE_PTR(j->job.allocs->allocs,
allocs)`): `nres_shared` stayed 0 and the payload's `allocs_shared`
was neither moved nor freed (a leak on top). That rebuilt record is
what `sched_job_update_fun()` re-sends to the scheduler as ground
truth, and the scheduler's JOB_UPDATE adoption (bug-1860 branch,
core_events.c) rebuilds `job->accounts` from exactly that wire copy —
so `accounts_shared == NULL`, `sched_account_jobs` charges nothing to
the vres, and `unsatisfy_` sees cap ≥ 0 + want forever. The scheduler's
own commit (`sched_commit_decision`, scheduler.c:1806-1812) built the
accounts correctly — the controller's "ground truth" clobbered it.
## Fix
job.c dispatch-time commit: migrate the shared records alongside the
host records — `MOVE_PTR(j->job.allocs->allocs_shared,
alloc->allocs_shared); j->job.allocs->nres_shared =
alloc->nres_shared; alloc->nres_shared = 0;` (MOVE, not copy — the
caller frees the payload; also closes the leak).
## Verification
- Test: `test_dc_success_migrates_shared_allocs`
(src/controller/testsuite/test_dispatch_commit.c). RED before the fix
("Expected 2 Was 0" on nres_shared), GREEN after.
- Suites: full meson test 136/136 OK (build.dbg), including controller
unit suite 1361/0.
- Live: t1 E2E — 3 projA RUN / 4th PEND, projB RUN (own instance), kill
one RUN job → pending projA re-admitted, external free pool
(fake_lic) enforced independently; all daemons healthy throughout.
## References
- Related: bug-1860 (the JOB_UPDATE ground-truth adoption that made the
stripped copy authoritative), external-license-resources design.md
§3.5/§3.6 (per-app→per-project terminology).