myxce/.wolf/bugs/bug-1883.md
Rongsong Shen 61f948e601
chore(buglog): bug-1883 logged (Gitea #334)
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-09-29 08:01:52 +00:00

4.5 KiB

id status status_updated status_note component severity timestamp last_seen occurrences files tags related gitea_issue gitea_synced_status gitea_synced_hash
bug-1883 open 2026-09-29 newly logged scheduler wrong-result 2026-09-29T04:07:19Z 2026-09-29T04:07:19Z 1
src/scheduler/src/plugins/seqjob_allocator.c
src/scheduler/src/plugin.c
src/scheduler/src/schedobj.c
src/scheduler/src/host_iter.c
scheduler
allocation
compound
seqjob
bug-1768
bug-1766
334 open 12cdc1100496

bug-1883: xce_scheduler seqjob reuses a stale per-host want from an earlier COMPOUND/ALTER primary

Description

Observed: (by code reading; no failing run captured yet) When a COMPOUND or ALTER job has a maxTasks == 1 primary after another primary in the same attempt, seqjob's host search for the later primary starts from the per-host want (ctx->alloc_req.host) left behind by the earlier primary, with slots:1 appended rather than replacing it:

.host on entry to seqjob host loop (2nd+ primary, shared ctx)
  = <previous primary's last per-host want, e.g. slots:N + rusage> + slots:1
  • plugin_prepare_allocation() resets only alloc_req.shared in the global pass (src/scheduler/src/plugin.c:617-619), never .host.
  • seqjob_prepare_allocation() appends slots=1 (src/scheduler/src/plugins/seqjob_allocator.c:118), and xvec_idval_store appends without dedup (src/lib/xvec.c:247-270).
  • The host iterator pre-filters candidates against this stale vector (src/scheduler/src/host_iter.c:136,158), silently dropping hosts that would satisfy the later primary's real {slots:1} want.
  • A global limit on slots reads the first match via get_resval_by_id (src/scheduler/src/resource.c:951-968), so it sees the stale N, not 1.

parjob does not have this problem because it clears .host per bucket (src/scheduler/src/plugins/parjob_allocator.c:478-479).

Expected: every primary's per-host want is computed from that primary's own resource request only (the bug-1768 principle), so the later seqjob primary is pre-filtered and limit-checked against {slots:1} plus its own rusage. Impact: wrong result. A later single-task primary of a COMPOUND/ALTER job can pend (or pick a later host) although a host that fits it is free; pend reasons can list hosts filtered on resources the primary never asked for. Plain single-primary jobs are unaffected (fresh ctx). Found by: review. Discovery/requirements research for spec scheduler-allocator-runner (2026-09-28). That spec deliberately keeps this behaviour (Requirement 3 AC 6) so the refactor stays behaviour-preserving; fix here, separately, with its own test.

Environment

  • OS: no /etc/os-release; Docker container; NixOS kernel; kernel Linux 6.18.33 x86_64
  • libc: glibc 2.42-47 (interpreter /nix/store/wb6rhpznjfczwlwx23zmdrrw74bayxw4-glibc-2.42-47/lib/ld-linux-x86-64.so.2)
  • Toolchain: gcc (GCC) 15.2.0, meson 1.9.1
  • Build: asan (xce.build)
  • Code: scheduler-framework @ 51736fa4-dirty
  • Deployment: n/a; found by code reading, not on a deployment. Affects any topology where the scheduler dispatches a COMPOUND/ALTER job with a maxTasks == 1 primary after another primary.

Reproduction

  1. git checkout 51736fa4 (branch scheduler-framework).
  2. Not yet reproduced by a test. Proposed white-box unit test (same harness as src/scheduler/testsuite/test_parjob_e2e_multislot.c's compound tests): one shared xce_sched_ctx_t; primary A maxTasks=4 dispatched through parjob onto host-1 (4 slots) so ctx->alloc_req.host ends as slots:4; then sched_ctx_set_primary() for primary B maxTasks=1, and run seqjob against host-2 with exactly 1 free slot.
  3. Expected RED: host-2 is pre-filtered out (stale slots:4) and B pends. Expected GREEN after a fix: B is placed on host-2.
  • Frequency: deterministic by code reading (not yet executed)
  • Evidence: not kept (no run yet). Code-reading trace in the research summary for spec .kiro/specs/scheduler-allocator-runner/ (requirements Requirement 3 AC 6).

Root cause

TODO: required for fixed/partial

Fix

TODO: required for fixed/partial

Verification

  • Test: TODO: name + file; RED before the fix, GREEN after
  • Suites: TODO: suite results and build profile
  • Live: TODO: soak/deploy run, or n/a and why

References

  • Related: bug-1768 (per-primary sizing), bug-1766 (COMPOUND publish-only-if-all-succeed)
  • Spec: .kiro/specs/scheduler-allocator-runner/ (keeps this behaviour; out of scope there)