| id | status | status_updated | status_note | component | severity | timestamp | last_seen | occurrences | files | tags | related | fix_commits | gitea_issue | gitea_synced_status | gitea_synced_hash | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| bug-1944 | fixed | 2026-10-10 | scheduler | wrong-result | 2026-10-10T08:14:56Z | 2026-10-10T08:14:56Z | 1 |
|
|
|
375 | fixed | 69bd8ab4a2cc |
bug-1944: xce_scheduler gives a job moved to another queue the queue's priority, so it jumps ahead
Description
Observed: (source reading, .kiro/reviews/project-gap-review-2026-10-10.md (P0); to be confirmed by a failing test before the fix)
New jobs get priority 0 (schedobj.c:214, core_events.c:353), but on a queue change the job's priority becomes the queue's priority (core_events.c:1360, schedobj.c:684); the picker sorts by job priority within a queue (plugins/builtin_fcfs.c:213).
Expected: Moving a job does not change its job priority.
Impact: Wrong ordering: moved jobs overtake jobs submitted earlier to the target queue.
Found by: review: .kiro/reviews/project-gap-review-2026-10-10.md (P0)
Environment
- OS: no /etc/os-release; Docker container; NixOS kernel; kernel Linux 6.18.33 x86_64
- libc: glibc 2.42-47 (interpreter /nix/store/wb6rhpznjfczwlwx23zmdrrw74bayxw4-glibc-2.42-47/lib/ld-linux-x86-64.so.2)
- Toolchain: gcc (GCC) 15.2.0, meson 1.9.1
- Build: asan (xce.build)
- Code: scheduler-framework @ 94472ee3-dirty
- Deployment: any (found by source reading; the failing test that confirms it is named in Verification)
Reproduction
- Two jobs pending in queue B; move a third job from A to B (queue priority > 0).
- The moved job is picked first.
- Frequency: deterministic (by code reading; confirmed by the RED test of the fix)
- Evidence: the code sites quoted in Description; no logs kept.
Root cause
On a queue change both xce_core_push_events (JOB_UPDATE, core_events.c) and sched_update_existing_job (schedobj.c) set job->priority = q->priority; new jobs and snapshot-restored jobs get 0, so moved jobs jumped ahead and live/replay disagreed. Pre-existing.
Fix
Both sites now only re-point job->queue on a move; queue priority still orders the queues. test_job_update.c, which asserted the old behaviour, now expects the job's own priority.
Verification
- Test:
test_moved_job_keeps_its_priority_and_place(src/scheduler/testsuite/test_job_move_priority.c): RED:208: FAIL: Expected 0 Was 10(and:214: Expected 2 Was 1for the ordering), GREEN after;test_update_existing_job_mutates_in_placeREDExpected 1 Was 5with the corrected expectation, GREEN after. - Suites:
xce-build.sh all asan xce.build --incrementalon the merged branch, 2026-10-10: all C suites Ok 155 / Fail 0, frontend Go unit tests ok, xceadmin tests ok; apiserverCGO_ENABLED=0 go test ./...(incl. middleware, router, cmd) ok - Live: n/a: unit/fixture-level verification only; no live deployment was run (follow-up)
References
- Fix commit:
7a9d75d6(onscheduler-framework; worker-branch original in the merge) - Review:
.kiro/reviews/project-gap-review-2026-10-10.md